Millwright (Wind) - Eclipse/Morning Light Repower - Wind Project
Adair, IA 
Share
Posted 18 months ago
Position No Longer Available
Position No Longer Available
Job Description

** To apply for this position, applicants must go through Millwright Local 948 hiring hall. Applications can be submitted by visiting or by calling 651-379-0200 **

Project Name: Eclipse/Morning Light Repower Wind Project

Project Location: 3337 Evergreen Ave, Adair, IA 50002

As Millwright, your primary duties include dismantling, erecting, assembling, aligning, adjusting, and/or maintaining machinery and equipment according to installation manuals, work instructions, layout plans, blueprints, and other drawings.

RESPONSIBILITIES

Receiving and offloading all major components

Installing loose components for Nacelle, hub, and tower preparation

Connecting blades to hub

Setting base and tower sections

Managing taglines

Involved with main erection crane assembly and teardown

Climbing ladders - average 80m

Drilling and/or tapping of all holes on turbines, generators, compressors, and pumps

Torqueing/tensioning any bolted connection

QUALIFICATIONS

Ability to read and interpret documents such as safety regulations, assembly/disassembly, operation and maintenance instructions, and procedure manuals

Strong teamwork orientation

Positive attitude and professional customer service skills

Detail oriented

Education and Experience Requirements

High School Diploma or GED

1 year of related experience preferred

Must possess valid driver's license of proper class and necessary endorsements as required by law

Mortenson is an EOE/Affirmative Action/M/F/Veteran/Disabled employer. EEO is the Law

 

Position No Longer Available
Job Summary
Start Date
As soon as possible
Employment Term and Type
Regular, Full Time
Required Education
High School or Equivalent
Required Experience
1+ years
Email this Job to Yourself or a Friend
Indicates required fields